Project: Ground floor, side & rear extension Location: Pulborough Road, SW18 Budget: £100k Duration: 16 weeks SQM added: 32SQM
Project: Ground floor extension Location: Meadway, TW2 Budget: £80k Duration: 15 weeks SQM added: 15SQM
Project: Single dormer loft conversion Location: Meadway, TW2 Budget: £60k Duration: 11 weeks SQM added: 23SQM
Project: L-shape loft conversion Location: Pulborough Road, SW18 Budget: £70k Duration: 12 weeks SQM added: 38SQM
- Architectural design - Planning permission - Building regulations pack
Project: Ground Floor, side return extension Location: Brudeneil Road, SW17 Budget: £60k Duration: 16 weeks SQM added: 15SQM
Project: Ground Floor, wraparound extension Budget: £60k Existing SQM: 46 Proposed SQM: 69 Kitchen supplier: Wickes
Project: Ground floor, rear extension Location: Chevening Road, SE19 Budget: £65k Existing SQM: 41 Proposed SQM: 57 Kitchen supplier: Howden’s
Project: Ground Floor, side extension Location: Southfields grid, SW18 Budget: £70k Floor provider: Porcelain Tiles SQM added: 10SQM
Project: Internal wall removals & refurbishment Location: Earlsfield, SW18 Budget: £35k Duration: 10 weeks Kitchen: Ikea
Project: Ground floor extension Location: Clapham Old Town, SW4 Budget: £80k Kitchen provider: John Lewis SQM added: 36SQM
Project: Ground floor extension Location: Stroud Green, N4 Budget: £60k Existing SQM: 27SQM Added SQM: 17SQM
Project: Loft conversion Location: Wandsworth, SW18 Budget: £42k Build duration: 10 weeks Added SQM: 31
Project: Loft conversion Location: Ealing, W5 Budget: £35.8k Build duration: 10 weeks SQM added: 25SQM
Project: Wall removal and refurbishment Location: Wandsworth, SW18 Budget: £4k Build duration: 2 weeks Floor material: Reclaimed wood
Project: First floor extension Location: Crouch End, N8 Budget: £55k Kitchen provider: Ikea SQM added: 25SQM
Project: Refurbishment Location: Wandsworth, SW18 Budget: 8k Window supplier: SPS SQM added: 1SQM
Project: Refurbishment & chimney removal Location: Southfields Grid, SW18 Budget: £8k Window provider: SPS windows SQM added: 1SQM
Project: Bathroom refurbishment Location: Putney, SW15 Budget: £10k Build duration: 2 weeks SQM added: -
Project: Bathroom extension & refurbishment Location: Wandsworth, SW18 Budget: £7k Floor provider: Fired Earth SQM added: 2SQM
The cost indicated includes full completion of the building works including all final fittings.
Thank you for booking a consultation. We have sent you a confirmation email with the details. We very much look forward to speaking you soon.
We are sorry, but the time slot requested has been booked. Please select another option or contact us directly.